Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorKafalı, Mustafa
dc.contributor.authorEren,Şükrü
dc.contributor.authorHelvacıoğlu, İsmail Hakkı
dc.contributor.authorÜnsan, Yalçın
dc.date.accessioned2022-02-10T06:49:55Z
dc.date.available2022-02-10T06:49:55Z
dc.date.issued2021en_US
dc.identifier.citationKafali, M., Eren, S., Helvacioglu, I. H., & Unsan, Y. (2021). A study on sub-work based work package determination methodology for shipyards. Ships and Offshore Structures, p.1-11.en_US
dc.identifier.issn1744-5302 / 1754-212X
dc.identifier.urihttps://hdl.handle.net/20.500.12960/1352
dc.description.abstractIndexed keywords SciVal Topics Metrics Abstract Shipyards face tough problems such as ineffective production control and poor planning. Identifying appropriate work packages is one of the challenges of ship production planning. Work packages consist of a group of sub-works. The activities of block production that must be completed at each work station are referred to as sub-works. This study proposes a two-stage hierarchical model for assessing work packages in a balanced way. The paper focuses on providing a predetermined completion time rather than minimising the project's completion time. Work packages are determined within the two stages. The first stage is developed to identify the boundaries of the metaheuristic search. A metaheuristic search procedure is implemented in the second stage. The simulated annealing (SA) optimisation algorithm is the foundation of this procedure. The findings reveal a link between sub-work size and work package configuration. Accordingly, smaller-sized sub-works provide a more balanced work package configuration.en_US
dc.language.isoengen_US
dc.publisherTaylor and Francisen_US
dc.relation.ispartofShips and Offshore Structuresen_US
dc.relation.isversionof10.1080/17445302.2021.1943848en_US
dc.rightsinfo:eu-repo/semantics/embargoedAccessen_US
dc.subjectOptimisationen_US
dc.subjectPlanningen_US
dc.subjectHip productionen_US
dc.subjectShipyarden_US
dc.subjectWork packageen_US
dc.titleA study on sub-work based work package determination methodology for shipyardsen_US
dc.typearticleen_US
dc.departmentMühendislik Fakültesi, Gemi İnşaatı ve Gemi Makineleri Mühendisliği Bölümüen_US
dc.contributor.institutionauthorHelvacıoğlu, İsmail Hakkı
dc.identifier.startpage1en_US
dc.identifier.endpage11en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster